Close Menu
    Trending
    • LG ELECTRONICS EXPANDS LATIN AMERICAN MANUFACTURING WITH NEW SMART FACTORY IN BRAZIL
    • South Korea auto exports reach $6.24 billion in July
    • Wison Engineering Secures $4 Billion EPC Contract for ADNOC Gas Natural Gas Processing Project
    • Total solar eclipse crosses Russian Arctic and Europe
    • International Youth Day 2026 puts youth inclusion in focus
    • DoGo Power Wins EUPD Research’s 2026 Top Innovation Award in Europe
    • Etihad sets December start for Abu Dhabi Gothenburg flights
    • Colebrook Bosson Saunders Launches 2026 Sustainability Report, Highlighting Measurable Progress Towards 2030 Targets
    • Home
    • Contact Us
    Irani TimesIrani Times
    Tuesday, August 18
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Irani TimesIrani Times
    Home » First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction
    PR Newswire

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    October 20, 2023
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    BEIJING, Oct. 20, 2023 /PRNewswire/ — JA Solar recently announced that the first phase of its Baotou Manufacturing Base 50MW Rooftop Distributed Photovoltaic (PV) Project has started construction. The project is believed to be an important step in promoting company-wide green production and operations.

    First Phase of JA Solar Baotou Manufacturing Base 50MW Rooftop PV Project Starts Construction

    With an investment of RMB150 million, the project will be constructed in four phases, and it is expected to be completed by the end of 2023. Installed with JA Solar n-type DeepBlue 4.0 modules, the project is expected to generate 65 million kWh of electricity per year, equivalent to a yearly carbon emission reduction of 54,000 tons. It has been commented by local media that the project will become a model in promoting the application of solar PV in the local area.

    JA Solar always adheres to the concept of sustainable development. JA Solar practices the concept of low-carbon development in its operations, and has built up a green manufacturing ecosystem. As of February 2023, six of JA Solar’s manufacturing bases have been listed in the Ministry of Industry and Information Technology (MIIT)’s “green factories” list. Earlier this year, the n-type products of JA Solar were awarded the carbon footprint PPE2 certification by the French authority Certisolis, which indicates that JA Solar is among the first batch of PV module manufacturers to obtain the French carbon footprint certification under the new PPE2 standard, and demonstrates the low-carbon competitiveness of JA Solar’s n-type products.

    Photo – https://mma.prnewswire.com/media/2252851/image_1.jpg

    Cision View original content:https://www.prnewswire.co.uk/news-releases/first-phase-of-ja-solar-baotou-manufacturing-base-50mw-rooftop-pv-project-starts-construction-301963021.html

    Related Posts

    LG ELECTRONICS EXPANDS LATIN AMERICAN MANUFACTURING WITH NEW SMART FACTORY IN BRAZIL

    August 17, 2026

    Wison Engineering Secures $4 Billion EPC Contract for ADNOC Gas Natural Gas Processing Project

    August 14, 2026

    DoGo Power Wins EUPD Research’s 2026 Top Innovation Award in Europe

    August 13, 2026

    Colebrook Bosson Saunders Launches 2026 Sustainability Report, Highlighting Measurable Progress Towards 2030 Targets

    August 13, 2026

    South Africa-China Electricity and Energy Investment Conference Opens at POWERCHINA Headquarters to Advance Long-Term Energy Partnerships

    August 12, 2026

    Tencent Cloud Powers Alsaif Gallery’s Enterprise AI Transformation in Saudi Arabia

    August 12, 2026
    Latest News

    South Korea auto exports reach $6.24 billion in July

    August 14, 2026

    Total solar eclipse crosses Russian Arctic and Europe

    August 13, 2026

    International Youth Day 2026 puts youth inclusion in focus

    August 13, 2026

    Etihad sets December start for Abu Dhabi Gothenburg flights

    August 13, 2026
    © 2026 Irani Times | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.